The Texas State Highway 288 (SH 288) expansion is a 10.3-mile roadway improvement south of downtown Houston with three major interchanges: Beltway 8, which will include eight direct connector/ramp bridges; Loop 610, which includes eight direct connector/ramp bridges; and The Texas Medical Center, which includes two direct connector/ramp bridges.
Construction began in Fall 2016 and was completed in November 2020.
The expansion was completed in accordance with a 52-year concession agreement for the design, construction, financing, operation, and maintenance of the managed toll lanes.
